The multi-purpose construction hoist developed by Baoda is highly efficient, safe, and economical, making it ideal for construction site. Apart from the lift cage used both for material and people, we have additionally equipped copper with a loading capacity of 0.7m3 concrete on the bottom of the lift cage, and reinforcement transportation structure which is able to contain 600kg of 9m-reinforcement on the side of lift cage. Operators can use the randomly-provided suspenders to load or unload the reinforcements.
Both single cage and double cage are offered for option. Upon request, we can add driver room to the construction elevator.
Technical Parameters of SC200/200N Construction HoistModel | SC200/200N |
Rated load (each lift cage) kg/ number of passengers | 2000/10 (without copper) |
Rated load capacity (kg) | 1000 |
Rated speed (m/min) | 0~60 |
Rated lifting speed (m/min) | 0~40 |
Max height (m) | 105 |
Voltage/ frequency | 380~415V/50Hz; 440~460V/60Hz |
Inner dimension of lift cage (L×W×H) (m) | 2.5 ×1.2 ×2.4 |
Mast section dimension (L×W×H) (m) | 0.65 ×0.65 ×1.508 |
Motors for each lift cage | 3 |
Rated power (kw) | 18.5 ×3 |
Starting current of each lift cage (A) | 0~120 |
Rated current of each lift cage (A) | 120 |
Power consumption of each lift cage (KVA) | 80 |
Weight of lift cage (containing transmission part) (kg) | |
Max weight of mast section (kg) | 195 |
Power of frequency inverter (kw) | 75 |
Counter weight (kg) | -- |