The STC100-Single and STC100-Double mast climbing work platforms/mast climbers are construction equipment designed for fast, flexible use. Due to the modular design, both are extremely efficient.
SHENXI has extensive technical and production experience with mast climbing platforms. In 2014, we completed a large order for 300 mast climbing platform sets with a quick delivery period and quality assurance earning significant praise from our customers.
Max number of people | 3 |
Rated lift speed | 7.3m/min |
Max working height | 150m |
Max platform length | 10m |
Standard platform width | 1.2m |
Max extension total width | 2.4m |
Height of first tie-in | no more than 4.5m |
Distance between tie-in | 6m (working height from 0-100m) |
6m (working height from 0-100m) | |
Mast section size | 1508×450×450mm |
Motor model | Y2EJ100L2-4 |
Power | 2×3kW |
Voltage and frequency | 3P |
Max number of people | 6 |
Rated lift speed | 7.3m/min |
Max working height | 150m |
Max platform length | 31m |
Standard platform width | 1.2m |
Max extension total width | 2.4m |
Height of first tie-in | no more than 4.5m |
Distance between tie-in | 6m (working height from 0-100m) |
6m (working height from 0-100m) | |
Mast section size | 1508×450×450mm |
Motor model | Y2EJ100L2-4 |
Power | 4×3kW |
Voltage and frequency | 3P |
1) Rapid erection and dismantling
2) Can work up to heights over 150m
3) Convenient working without obstructions from scaffold tubes or fittings
4) Time and cost savings up to 40%
5) Platform covers can be added for extra comfort and safety
6) The length and width of the platforms can be adapted for different situations