Features
The Baoyue prep station draws fresh air from the cleaner upper levels of the shop through a pressurization fan. The clean air is forced into the prep station through a filter bank located in the ceiling near the entry point. The air is then drawn through the prep station work area into a filtered exhaust plenum at the opposite end, and discharged into the atmosphere through an exhaust fan and stack. This design makes it easy to add a heated air makeup unit. The panels, assembly hardware, filters, and sealants needed for mechanical installation are all included. The back side is a 50mm EPS wallboard, with the other three sides comprised of PVC curtains. The intake and exhaust stacks, control panel and other electrical components are not to be purchased separately.
Item | Detailed Specification |
Inside dimension | 6300×3450×2650 mm (L×W×H) |
Outside dimension | 7550×3550×3100mm (L×W×H) |
Plenum dimension | 6300×3450×450 mm (L×W×H) |
Steel basement | No steel basement, exhaust from 2 lines pit. |
Room body | Back side 50mm EPS wall panel, the other sides PVC curtain. |
Light | Ceiling Lights: LED 8Units×4Pcs=32Pcs×36W, lighting boxes are powered coated. |
Generator cabinet | Exhaust from back side, galvanized steel frame; white machine-made panel covered, filled with heat preservation material inside. |
Intake and Exhaust system | 1×5.5KW turbo fan, air capacity: 18000m3/h, with electric damper. |
Purification system | Pre-filter, ceiling filter, fiberglass filter. |
Roof | Galvanized steel |
Control system | Fan switch, lighting switch, emergency stop. |
Installation method | Hooked from roof by steel cable or supported by steel column. |
Total power | 6.7KW (Power supply 1×220V, 3×380V, 50HZ) |